
Wyndham Grand Hotel Ballroom Expansion
Bonnet Creek, Orlando, Florida
Client: Wyndham Worldwide
Completion: May 2015
JCOSTA Group provided Geotechnical Exploration Services for the two–story 3,500 square foot ballroom expansion.

Coto Laurel 14 MW Photovoltaic Solar Farm
Ponce, Puerto Rico
Client: Schletter, Inc.
Completion: July 2015
JCOSTA Group monitored the installation of steel piles associated with the solar panels and performed vertical and lateral load testing on the piles. In addition, performed laboratory analysis of the soils.

Costco Wholesale Pavement Evaluation
Bayamón, Puerto Rico
Client: Costco Wholesale Corporation
Completion: July 2015
JCOSTA Group performed Pavement Condition Survey (PCS) of the asphalt pavement of two existing Costco Wholesale stores in Bayamón, PR. Our scope of work included visual pavement evaluation followed by coring/boring and test pits to determine the existing site pavement and subgrade conditions and discuss possible repair and replacement options.

Dr. Phillips Center for the Performing Arts – Stage II
Orlando, Florida
Client: Dr. Phillips Center for the Performing Arts
Scheduled Completion: 2020
JCOSTA Group is providing Project Management services in association with Terracon Consultants as part of the construction of the DPAC Stage II project. The project consists of the construction of a large rehearsal room and performance space, full kitchen facilities, continued lobby space and the 1,700-seat acoustical theater.